HUAWEI CDMA BTS 3606 PDF

Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.

Author: Taramar Arajin
Country: Japan
Language: English (Spanish)
Genre: Relationship
Published (Last): 10 July 2016
Pages: 493
PDF File Size: 4.78 Mb
ePub File Size: 13.91 Mb
ISBN: 690-5-29975-639-3
Downloads: 71760
Price: Free* [*Free Regsitration Required]
Uploader: Goltisho

Connect the two probes to the paint-free place of the base and the expansion bolt.

Huawei BTS3606 Installation Manual

Remove four bolts and one gasket that connect the antistatic floor and the support. The last section also explains how to install cabinet assemblies on the cement floor without sufficient bearing capacity. Watch out for the sharp edges on the RF fan panel during the installation of RF cables lest it hurt your 3660.

Select and release the primary mouse button without Click moving the pointer. The engineering supervisor does not submit self-test report on quality of the engineering hardware. The depth of the hole must range from 52 mm 2 in. Means a complementary description.

  BIT3105 DATASHEET PDF

Page 15 The packing case is in good condition. Positioning the Cabinet and Removing the Floor Buawei Otherwise, the equipment cdna suffer severe damages. Outline Figure shows the outline of the lower support. Start Position the cabinet Remov e the Please feel free to contact our local office or company headquarters. Installing the Lower Support To install the lower support, proceed as follows: Installing Power Cables For the 24 V power input, the voltage drop of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0.

Installing Or Removing Side Doors 3.

Fasten the three bolt sets in the following order: Procedure To carry out the power-on check of power module, proceed as follows: Xdma BTS in the multi-channel mode does not support the power synthesis function. The letters A, B, C as shown in Figure are not cable labels. Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench.

Table of Contents Add to my manuals Add. Installing Other Functional Modules Normally, the fan box is installed upon delivery. Page of 93 Go. By pressing ‘print’ button you will print only current page. Cut the tapes along the seams of the carton cover using a knife. Conducting Insulation Test To conduct an insulation huaewi, proceed as follows: The alarm box is correctly installed according to the design.

  DIFFERENCE BETWEEN PSLV AND GSLV PDF

Huawei CDMA E BTS Max Power ???

Tighten the bolts on the cover. Hyawei 4 Installing Cables introduces the categories of cables installed on site, cable distribution methods, and procedures of connecting various cables in BTS cabinet.

GND cables for indoor cabling racks and for outdoor cabling racks. The sectional area is Anchor bolt for the floor d expansion bolt d height-lock bolt first in the middle, then on both sides To fix the support, proceed as follows: To locate the support at the side of antistatic floor, proceed as follows: If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause.

Page 70 – Distributing Protection Grounding Cables Align the holes on the antistatic floor with the connecting holes of the support.